Manufacturing

Made close. Shipped clear.

Every order is routed to the manufacturing partner best positioned to fulfil it — balancing cost, lead time and distance to the buyer. You see the timeline; the parcel is tracked to the door.

Last updated August 2026

How routing works

The moment an order is placed, the production plan picks a manufacturing partner.

Nearest capable partner

We prefer the manufacturer closest to the buyer that can make the piece to spec.

Cost-to-door, not just cost

Routing weighs manufacturing cost against shipping, so the cheapest path is the one that lands cheapest at the door.

Live lead times

Each product publishes its current lead time; listings show it before checkout.

Automatic failover

If a partner is at capacity, the order quietly moves to the next best one — no action needed from you.

What buyers get

A calm, predictable delivery experience on every order.

Tracking from day one

A tracking link is issued as soon as the item is printed and handed to the carrier.

Estimated delivery

Shown up front at checkout, computed from the chosen partner and destination.

30-day returns

Buyers can return within 30 days; defects and misprints are remade on our side.

Carbon-aware routing

Shorter hops to the buyer mean lower transit emissions on average.

Typical timelines

Most pieces are produced and dispatched within 12–28 days, with delivery a few days after dispatch. Adapter lead times are displayed on each product card and on the listing page, so expectations are set before the buyer ever pays.

Ship anywhere

Publish once, sell worldwide

Your order ships to <strong>6 customs zones</strong> (US, EU, VN, SG, JP, AU) through the manufacturing network — no logistics work required.

Browse the catalogue